Opens in a new tab
Equinox Projects
Bringing life back to spaces
Floor Tiles & Waterproofing · Point Piper
ProjectsInsurance · Remedial Waterproofing

45 Wolseley Road, Point Piper

Removal and replacement of floor tiles and waterproofing to make the area watertight again.

InsuranceSectorRemedial WaterproofingType of workPoint Piper, NSWLocation
01 · Overview

Removal and replacement of floor tiles and waterproofing to make the area watertight again.

Careful demolition, membrane reinstatement and finish matching protected adjoining fabric while restoring a watertight, durable floor assembly.

Tile removal, membrane reinstatement and floor replacement.

Watertight assembly restored; adjoining fabric protected.

Outcome
02 · How it was delivered

A sequence that keeps the building open.

01Site walkStage 01We attend, measure and learn how the space is used day to day who is in it, when, and what cannot be interrupted.
02ScopeStage 02We define the project boundaries, budget and timeline aligning every stakeholder on what will be delivered and when.
03BuildStage 03Our team brings the design to life on-site coordinating trades, managing materials and keeping quality at every step.
04HandoverStage 04We walk through the finished space, hand over documentation and make sure everything works exactly as planned.

Ready to discuss your project?

Complimentary site consultation and quote — no obligation. We respond within one business day.